Understanding Building Permits

Building permits are one of the most reliable signals of active development. This guide explains what they contain and how to use them.

Landexar Research Team August 11, 2026 6 min read

What Is a Building Permit?

A building permit is an official authorization issued by a local government — typically a city or county building department — that allows construction, renovation, demolition, or a change of use to proceed on a specific property. Permits are required for most significant construction work to ensure that projects comply with local building codes, zoning requirements, and safety standards.

From a property research perspective, building permits are among the most reliable and actionable data points available. Unlike planning applications, which represent intent, a building permit represents a legal authorization to build. A permit issuance is a high-certainty signal that a project is actively moving forward.

Building permit records are public documents in most jurisdictions and are maintained by the local building department. The level of detail and accessibility varies significantly by municipality, but most permit records include enough information to be useful for research purposes.

Types of Building Permits

Not all permits are equal in what they signal. Understanding the type of permit helps you interpret what it means:

  • New Construction — A permit for a new building or structure. This is the most significant type from a development intelligence perspective, as it represents entirely new supply entering the market.
  • Addition — A permit to expand an existing structure. Additions can range from minor residential expansions to significant commercial buildouts.
  • Renovation / Alteration — A permit to modify the interior or exterior of an existing structure without adding square footage. Can range from minor cosmetic work to full gut renovations.
  • Demolition — A permit to tear down an existing structure. Demolition permits often precede new construction and can signal that a site is being cleared for redevelopment.
  • Change of Use — A permit to convert a building from one use to another — for example, converting an office building to residential apartments.
  • Mechanical, Electrical, Plumbing (MEP) — Permits for specific systems within a building. These are often pulled as part of a larger construction project and can confirm that active work is underway.
  • Grading / Site Work — Permits for earthwork and site preparation. These often precede vertical construction and can signal that a project is moving toward the building phase.

What Permit Records Contain

A typical building permit record includes some or all of the following information:

  • Permit number — A unique identifier assigned by the issuing authority.
  • Address and parcel number — The location of the permitted work.
  • Permit type — The category of work authorized (new construction, renovation, demolition, etc.).
  • Work description — A brief description of the scope of work. Quality varies widely — some descriptions are detailed; others are generic.
  • Applicant and contractor — The name of the permit applicant (often the property owner or developer) and the licensed contractor performing the work.
  • Application date — When the permit application was submitted.
  • Issuance date — When the permit was approved and issued.
  • Expiration date — Permits typically expire if work does not begin within a specified period or if inspections are not completed on schedule.
  • Valuation — The estimated value of the construction work. This is self-reported and may not reflect actual costs, but it provides a rough sense of project scale.
  • Status — Whether the permit is active, expired, finaled (completed), or voided.
  • Inspection records — A log of inspections conducted during construction, which can confirm that active work is underway.

The Permit Lifecycle

A permit moves through several stages from application to completion:

  • Applied — The application has been submitted and is awaiting review.
  • Under Review — Building department staff are reviewing the application for code compliance.
  • Issued — The permit has been approved and issued. Work may begin.
  • Active / Under Inspection — Work is underway and inspections are being conducted at required milestones.
  • Finaled / Certificate of Occupancy Issued — All inspections have been passed and the work is complete. For new construction, a certificate of occupancy (CO) is issued, authorizing the building to be occupied.
  • Expired — The permit expired before work was completed or before inspections were scheduled. An expired permit may indicate a stalled or abandoned project.
  • Voided / Cancelled — The permit was cancelled before work began.

How to Use Permit Data in Research

  • Confirm active construction. An issued permit with recent inspection activity is strong confirmation that a project is actively underway.
  • Identify demolition activity. Demolition permits on nearby parcels can signal that sites are being cleared for redevelopment.
  • Assess renovation investment. A high-valuation renovation permit on a nearby property can signal that an owner is investing in an area — a positive signal for neighborhood trajectory.
  • Track new supply. New construction permits in a market segment (residential, commercial, industrial) contribute to the supply pipeline and can affect market conditions.
  • Identify stalled projects. An expired permit or a permit with no recent inspection activity may indicate a project that has stalled or been abandoned.
  • Verify project claims. If a seller or broker claims that a nearby development is "under construction," permit records can confirm or contradict that claim.

Limitations and Caveats

  • Permit data quality varies significantly by jurisdiction. Some municipalities maintain detailed, up-to-date records; others have incomplete or delayed data.
  • Work descriptions are often generic and may not accurately describe the scope of a project.
  • Permit valuation is self-reported and may not reflect actual construction costs.
  • Not all construction activity requires a permit. Minor work below certain thresholds may proceed without a permit in many jurisdictions.
  • This guide provides general educational information. It does not constitute legal, investment, or professional advice.

Key Takeaways

  • 1Building permits are one of the most reliable indicators of active development activity.
  • 2An issued permit with active inspections is high-certainty confirmation that a project is underway.
  • 3Permit type matters: new construction, demolition, and change-of-use permits carry different implications.
  • 4Expired permits may indicate stalled or abandoned projects — always check the current status.
  • 5Permit data quality varies by jurisdiction. Note the source and verification date.
  • 6Permit records are public documents and are a foundational input for development intelligence.

Related Landexar Features

Access Permit Data on Landexar

Landexar aggregates building permit records from municipal systems and presents them in context with planning activity, zoning, and parcel data for any address.

Explore the Platform

Ready to explore?

Access permit data for any address.

Explore Landexar